FOXBORO P0926GH With Factory Original Box

FOXBORO P0926GH inquiry details,pls pay attention as below: 1.All quote based on EXW only 2.Shipping time:5-7 days,via DHL/TNT/UPS/EMS/Fedex.. 3.Payment terms: 100% T/T or Western Union PAYMENTS before shipping FOXBORO P0926G The chassis power supplies are designed to withstand brief power losses without affecting the operation of the system. The time the system is operational during power loss is called program scan hold-up time after loss of power. The duration of the power supply hold-up time depends on the number, type, and state of the I/O modules, but is typically 20 ms...3 s Related products: A03B-0807-K103 A03B-0801-C021 A03B0801C021 AO3B-O8O1-CO21 A03B-0801-C058 A03B-0807-C012 A03B-0807-C001 A03B-0807-C171

  • Keywords : FOXBORO
  • Category : Electrical Equipment & Supplies >> Other Electronic Components
  • Country : China
  • Minimum order Quantity : 1
  • FOB Price (USD) Min : 0.00-0.00
  • Unit price : 61
  • Payment Type : T/T , Western Union
  • Supplying Ability : 20611
  • Delivery : 2-3 days
  • Countries   China   India   Indonesia   Malaysia   Pakistan   Turkey   United Kingdom   United States   All Countries