LSH Vertical Boiler

LSH Vertical Boiler Capacity: 0.5t/h-1t/h  0.35mw/h - 0.7mw/h Pressure:0.7Mpa-2.5Mpa Fuel:Coal, Biomass pellet, Rice Husk, Bagasse, etc.  Vertical Boiler Description Vertical coal-fired boiler,A head, drum, top Furnace, Furnace, bending pipe and other components. Vertical bending the structural features of water-tube boilers are:  Furnace that has the curved pipe, increasing the radiation heating surface. However, a larger Furnace water level, lower the oven temperature, therefore, generally suitable for burning high quality coal. Such as the increase in the furnace refractory bricks, to maintain a high temperature, can also use the low quality coal species. Better water circulation. Using double-grate combustion chamber, heating quickly, can burn once again, to achieve full combustion, eliminating smoke, dust removal effect. Reasonable layout of the boiler structure, good heat transfer. The boiler design is reasonable, simple structure, convenient operation, easy maintenance, small footprint, low investment and production of steam and heating can be used for enterprises and units.  Vertical Boiler Suppliers & Factory For Sale Performance characteristics of Coal/Biomass Fired Boiler: 1, the furnace compared with the old vertical boiler, heating area bigger, faster step-heating, less coal consumption, higher thermal efficiency, can save 25-30% of coal. 2, a multi-purpose boiler, the furnace production of steam can be used in canteens steaming rice, tableware disinfection, baths heating, steam production, room heating and so on. 3, the furnace uses natural ventilation, do not blowers and induced draft fan and no noise. 4, compact structure, easy installation, simple operation, easy maintenance, can whole removal, the unit for mobile use. 5, baths with steam heatin

  • Keywords : Coal/Biomass Fired Boiler
  • Category : Industrial Machinery >> Boilers
  • Country : China
  • Minimum order Quantity : 1
  • FOB Price (USD) Min : 0.00-0.00
  • Unit price : 70
  • Supplying Ability : 20000704
  • Delivery : 10-90 days
  • Packaging Detail : (1) Boiler and mainly auxiliary equipment wrapped with membrane. (2) Instruments&Valves: Iron/Plywood box.
  • Countries   China   India   Indonesia   Malaysia   Pakistan   Turkey   United Kingdom   United States   All Countries